Creating an effective workspace environment
8
Secure Pre-Engineered Design and Construction
The required level of security combined with rapid construction
deployment were crucial to the success of the project. Workspace
Technology selected a specialist ‘pre-engineered’ unique high
security composite system delivering robust levels of security;
protecting against attack, fire, water and temperature. This industry
leading UK manufactured product ensured full compliance creating
the ‘white space’ for the internal data centre fit out phase.
A computer grade raised access floor was installed to support
distribution of services and chilled water distribution.
Electrical Design & Installation
Workspace Technology’s in house Data Centre Solutions Division
designed and installed a complete end to end electrical installation
including generator set, Schneider Electric LV Switchgear, critical and
mechanical power distribution.
Modular Power Distribution In-Row Critical Power - Workspace
Technology deployed Schneider Electric / APC industry leading
Modular “In-Row” Scalable and efficient 3-phase Power Distribution.
APC’s In-Row Modular Power Distribution enables rapid expansion
or reconfiguration and power distribution management is simplified
by output metering, branch current/circuit monitoring and auto-
detection by the StruxureWare suite of management software.
When demand rises and expansion becomes necessary it possible
to simply plug in new Power Distribution Modules. The factory-
assembled modules, which include circuit breaker, power cord, and
power connection, can be installed in mere minutes.
Schneider Electric’s PM750 meters were deployed throughout
enabling power monitoring through the StruxureWare Power
Management Expert energy management software.