Creating an effective workspace environment

8

Secure Pre-Engineered Design and Construction

The required level of security combined with rapid construction

deployment were crucial to the success of the project. Workspace

Technology selected a specialist ‘pre-engineered’ unique high

security composite system delivering robust levels of security;

protecting against attack, fire, water and temperature. This industry

leading UK manufactured product ensured full compliance creating

the ‘white space’ for the internal data centre fit out phase.

A computer grade raised access floor was installed to support

distribution of services and chilled water distribution.

Electrical Design & Installation

Workspace Technology’s in house Data Centre Solutions Division

designed and installed a complete end to end electrical installation

including generator set, Schneider Electric LV Switchgear, critical and

mechanical power distribution.

Modular Power Distribution In-Row Critical Power - Workspace

Technology deployed Schneider Electric / APC industry leading

Modular “In-Row” Scalable and efficient 3-phase Power Distribution.

APC’s In-Row Modular Power Distribution enables rapid expansion

or reconfiguration and power distribution management is simplified

by output metering, branch current/circuit monitoring and auto-

detection by the StruxureWare suite of management software.

When demand rises and expansion becomes necessary it possible

to simply plug in new Power Distribution Modules. The factory-

assembled modules, which include circuit breaker, power cord, and

power connection, can be installed in mere minutes.

Schneider Electric’s PM750 meters were deployed throughout

enabling power monitoring through the StruxureWare Power

Management Expert energy management software.