Creating an effective workspace environment
10
Technical Challenges
Workspace Technology’s team worked closely with the architects to ensure steel
work was carefully aligned with rack aisles maximising floor space and
eliminating any potential restrictions within access aisles.
Project Team Success
A strict design review and agreement regime was implemented by Workspace
Technology to ensure that the delivery team were able to engineer absolute
levels of accuracy, which paid back many times over by ensuring first time
success. Also, by implementing risk analysis to every potential failure scenario
enabled the team to eliminate the loss of customer service through engineering
excellence and innovation. Input from our ex-military engineers ensured our full
compliance with the latest MOD JSP standards for all aspects of the design.
The project team left no stone unturned by implementing ‘what if’ analysis
strategy as part of the design phase, and by applying a ‘getting back to basics’
method, Workspace Technology ensured electrical and cooling design
principles were correctly applied with appropriate discrimination and safety
margins to deliver a robust data centre design.
Complete Integration & Support Services
Workspace Technology provided a complete wrap around 24/7 planned
preventative and emergency callout maintenance and optimisation support
package via its Engineering & Support Services Division.
Andy Orton, Sales Director for Workspace Technology, commented
“Workspace Technology has and will continue to pro-actively employ ex British
military personnel. This skill set uniquely positions Workspace Technology with
an understanding of defence sector data centre and I.T Infrastructure
requirements differentiating us from our competitors. This project raises the bar
and ensures Workspace Technology continue with our expansion plans into the
UK defence sector”
Planned
Preventative
Maintenance
Emergency
Break Fit
Response
Data Centre
Optimisation
Services