Creating an effective workspace environment

5

Design Overview

Workspace Technology delivered a diverse High Efficiency Next

Generation Data Centre for the Defence Infrastructure Organisation

(DIO). The project included construction of the room with secure

modular composite panel, electrical switchgear and distribution,

expansion of existing Schneider Electric / APC UPS Systems,

equipment racks, aisle containment, structured cabling and In-Row

cooling systems. Workspace Technology’s Power Generation team

also deployed a new 400kVA generator set with custom built external

switchgear. All installations were completed in line with current MOD

JSP standards.

‘Spend to Save’ Investment

Defence contractors are required to identify potential energy

reducing ‘spend-to-save’ opportunities and with the investment in

Next Generation Data Centre Infrastructure (NGDCI), the DIO lead

the way when it comes to reducing energy consumption while

increasing operational efficiency and maintaining exceptional levels

of service.

Through the incorporation of specialist energy monitoring

technology, the latest in energy efficient devices, including UPS and

PDU systems, combined and operated by a real time Data Centre

Integrated Management (DCIM) platform, the DIO operates a data

centre that performs at an industry leading level of efficiency.